From survey to first swim
How your pool is installed
Installing a one-piece pool is far quicker and less disruptive than a traditional build. Because the pool is manufactured off-site and arrives ready-made, installation is typically completed in weeks rather than months. Here’s what to expect at each stage, so there are no surprises along the way.
Before work starts
Planning permission
Many pools can be installed under permitted development, so planning permission isn’t needed. You may need permission if your home is listed, you live in a conservation area, the pool significantly changes ground levels, or you are planning additional structures such as an enclosure. It’s always worth checking with your local authority, and we can guide you through it.
Location and access
Where your pool sits affects how much you enjoy it. Think about sun throughout the day, shelter from the wind and privacy from neighbours. Site access also matters, as the delivery vehicle and crane need to be able to reach the garden.
Heating and covers
In the UK, heating and insulation are key to getting the most from your pool. Air source heat pumps are efficient and cost-effective, and a high-quality cover retains heat, reduces evaporation, improves safety and significantly lowers running costs.